
Painting the frame
These last two weeks have seen the entire steel structure coated in fire-retardant (intumescent) paint and a concrete deck laid above the veranda around the Temple.
29 November 2020
These last two weeks have seen the entire steel structure coated in fire-retardant (intumescent) paint and a concrete deck laid above the veranda around the Temple.