
Pintura da Estrutura
These last two weeks have seen the entire steel structure coated in fire-retardant (intumescent) paint and a concrete deck laid above the veranda around the Temple.
29 novembro 2020
These last two weeks have seen the entire steel structure coated in fire-retardant (intumescent) paint and a concrete deck laid above the veranda around the Temple.