Preparing the first 8 statues

The statues are first carefully cleaned

Preparing the statues bases

Multiple coats of paint are used

Final paint and texture on the last ring

Finishing the last ring

Preparing the lighting fixtures on the lower ceiling

Masons cover the veranda pillars in granite

Covering the veranda pillars in stone

Wonderful views are enjoyed from the Sangha accommodations car parking

Sangha accommodations car parking being paved

The camping toilets water and sewer systems are ready

The camping toilets water and sewer systems are ready

Anaerobic filter for the camping toilets sewer system

Anaerobic filter for the camping toilets sewer system

Anaerobic filter for the camping toilets sewer system

The main temple access road before grating

Grass is added to assure soil retention

Marque area

Marque area

Main Temple soil retention

Final grating along the Main Temple access road

Top soil and grass are replaced along the access road

Soil retention is nearly completed along the access road