Working on the roof 16 metres up – sealing the rain gutters

The roof work at 12 and 14 metres

Roof work at 10 metres

Roof work at 7 metres

Special tiles made with polyurethane to deflect the heat of the sun and block the noise of the rain

Laying the foundations for the central water supply

The water containers arrive

The containers in place

Rendering the external walls – starting from the top they have now reached the level of the veranda

Geo-physicists arrive to begin the search for water

The search begins

Modern-day water divining!

The main pillars are being faced with bricks and the veranda ceiling made ready for painting

Preparing the main access road

Plastering the smaller pillars

From this you can get an impression of the scale of the Temple!

Final decorating in the Sangha accommodation