The Temple is covered with tarps and scaffold
Large propane tanks keep it warm and balmy under the tarp
Here is a view of the golden windows under the tarp

The scaffold is loaded with bricks
The brick workers begin laying the Temple brick
Now the building is looking like a Temple!
Meanwhile, the elevator door has been cut out
Here is a view of the elevator pit
Bob cuts out a side door beside the elevator door
And Hank works on putting in the new staircase
The ductwork in the main room is framed out
And the glass workers begin upstairs
The first four panes of the mezzanine glass are installed
The glass is designed to light up from above and below to show the 8 auspicious signs
And Jamyang prepares some patchwork beside the golden deer
Dinner time with Andrew and Brenda after another day at the Temple
Our new resident, Kelsang Yongdzin
See you at the Canadian Kadampa Festival in April