The shrine
A natural gas heater keeps the Temple warm
The gold windows as you can see are very beautiful
The gold windows have been installed in the front wall
The windows reflect a golden light inside when light shines on them
The radiant heat boiler is being installed in the mechanical room
The ritual prep room behind the shrine
The landing for the new staircase has been formed
Building the main entrance way to the Temple
The golden windows can be seen peeking out behind the tarp
The stairs took three days to form
The doorway has been chopped out to make way for the new main doors
Gilded flashing will go on the apex
The gilding being applied to the flashing for the Temple’s apex
Gilding and studying at the same time