skip to be filled

Steel and lvls are prepared

Side door of temple
Bricklayers arrive
Side door is filled in

view of side door from outside
View from floor above
The ladder is the new staircase
Door has been completely bricked in
Window is being bricked in as well
The elevator will go here
Goodbye window
Two new doors have been cut at the back of the building
These doors are behind the shrine area
The beams will support the shrine and stairs
View of shrine area from mezzanine
Shrine floor is going in
The shrine will be installed next week on this floor
Lvls are inserted in the floor joists to support the shrine