The mountains at sunset

Palden in “his office” – the future meditation room

Palden and the drilling machine: making more rubble to be carried away

The result of Palden’s work – the dining room was clean before – but on the other hand is now larger as a wall has been taken out.

Markus a professional electrician and member of the Nalanda Zentrum Luzern is responsible for the electrical work at Kailash and is removing the old electric cables.

New electrical cables need to be installed throughout the building and then the walls restored.

Thomas is helping Markus to get the wires in

Thomas is helping Markus to get the wires in

The lake near Törbel